Meridian-america Link/Customer Controlled Routing Manual de usuario

Busca en linea o descarga Manual de usuario para Hardware Meridian-america Link/Customer Controlled Routing. Meridian America Link/Customer Controlled Routing User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 595
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
© 1998 Northern Telecom
All rights reserved
Printed in the United States of America
Northern Telecom reserves the right to make changes in equipment, design, or components as progress in
engineering or manufacturing may warrant.
Meridian 1, SL-1, and Nortel are trademarks of Northern Telecom. UNIX is a trademark of AT&T. Motorola is a
trademark of the Motorola Corporation. MVME products are trademarked by the Motorola Corporation.
Ethernet is a trademark of the Xerox Corporation. Reflection is a trademark of Walker Richer & Quinn, Inc.
DEC, VT220, VT320, and VT420 are trademarks of Digital Equipment Corporation. UDS is a trademark of
Motorola Incorporated.
Meridian 1
Meridian Link/Customer Controlled Routing
Installation and Upgrade Guide
Publication number: 553-3202-210
Product release: Meridian Link Release 5C/Customer Contolled Routing Release 3C
Document status: Standard 1.0
Date: October 1998
Vista de pagina 0
1 2 3 4 5 6 ... 594 595

Indice de contenidos

Pagina 1 - Meridian 1

© 1998 Northern TelecomAll rights reservedPrinted in the United States of AmericaNorthern Telecom reserves the right to make changes in equipment, des

Pagina 2

x Contents553-3202-210 Standard October 1998Configure devices for status change host notification 330Define status message groups 333Assign tel

Pagina 3 - Publication history

82 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998VME bus backplane (Application Module)The six-slot VME bus backplane

Pagina 4

Chapter 4: Meridian Link/CCR hardware 83Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideInput/output panelThree versions of th

Pagina 5 - Contents

84 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Figure 27I/O subpanel (Application Module)J9 J8 J7J6 J5 J4J3 J2 J1Mer

Pagina 6 - Routing 27

Chapter 4: Meridian Link/CCR hardware 85Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 28Universal I/O panel (Applicat

Pagina 7 - Contents vii

86 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Figure 29Generic I/O panel (Application Module)CARD 1CONN 4CARD 1CONN

Pagina 8

87Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 5: Hardware installationoverviewPreparing for installationAs soon as t

Pagina 9 - Contents ix

88 Chapter 5: Hardware installation overview553-3202-210 Standard October 1998Installing an IPE Module or an Application ModuleThis section sum

Pagina 10

Chapter 5: Hardware installation overview 89Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideIPE or Application Module software

Pagina 11 - Contents xi

90 Chapter 5: Hardware installation overview553-3202-210 Standard October 1998Table 12Installing an Application ModuleProcedure Reference1. Go

Pagina 12

91Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 6: Site survey/installationchecklistThe purpose of this chapter is to

Pagina 13 - Index 559

Contents xiMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSection 6: To upgrade Meridian Link from Release 4B toRelease 5C an

Pagina 14

92 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998DistributorName: ____________________________________________

Pagina 15 - About this guide

Chapter 6: Site survey/installation checklist 93Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideDelivery informationProvide da

Pagina 16

94 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Loading equipment requiredResponsible party: ________________

Pagina 17

Chapter 6: Site survey/installation checklist 95Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideRequirements for Meridian Link

Pagina 18 - References

96 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Table 14Meridian LinkÑOptional Meridian 1 software packagesMe

Pagina 19 - Chapter 1: Meridian Link/CCR

Chapter 6: Site survey/installation checklist 97Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideRequirements for CCRChapter 3,

Pagina 20 - Host Link

98 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Contact your Nortel support personnel if there are any discre

Pagina 21

Chapter 6: Site survey/installation checklist 99Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideRequirements for Meridian Mail

Pagina 22

100 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Meridian Mail hardware checklist to support Meridian LinkUse

Pagina 23 - Ethernet LAN-based PC

Chapter 6: Site survey/installation checklist 101Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideIPE Module and Application Mo

Pagina 24

xii Contents553-3202-210 Standard October 1998Chapter 15: Link configuration 479Default configuration 479Link 0ÑApplication Module Link 479Link

Pagina 25

102 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Table 17IPE Module and Application Module software optionsIP

Pagina 26

Chapter 6: Site survey/installation checklist 103Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideDocumentationVerify that prop

Pagina 27

104 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998HardwareUse the following checklists to check the hardware.T

Pagina 28 - Figure 2

Chapter 6: Site survey/installation checklist 105Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 22Hard disk and tape dr

Pagina 29

106 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Power and ground considerationsYour moduleÕs power source is

Pagina 30

Chapter 6: Site survey/installation checklist 107Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideEquipment cablingThe followin

Pagina 31 - Meridian Link application

108 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Peripheral device cablingMeasure the cable distance for the

Pagina 32

Chapter 6: Site survey/installation checklist 109Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 25Peripheral devices ca

Pagina 33 - Link overview

110 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Table 25Peripheral devices cable distance (continued)Periphe

Pagina 34 - Diagnostic tools

Chapter 6: Site survey/installation checklist 111Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTelephony connectionsMeasure

Pagina 35

Contents xiiiMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 18: Acceptance testing 527Meridian Link/CCR 527Meridian M

Pagina 36

112 Chapter 6: Site survey/installation checklist553-3202-210 Standard October 1998Equipment room cooling conditionsUse this list to note the c

Pagina 37

Chapter 6: Site survey/installation checklist 113Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideComments and recommendations_

Pagina 39 - Software overview

115Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 7: Unpack and inspect hardwareYou should use this chapter in conjunct

Pagina 40

116 Chapter 7: Unpack and inspect hardware553-3202-210 Standard October 1998¥ Store circuit packs in a clean, dry area.¥ When tape cartridges h

Pagina 41

Chapter 7: Unpack and inspect hardware 117Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideUnpacking the IPE Module and Applica

Pagina 42 - Ethernet LAN-based host

118 Chapter 7: Unpack and inspect hardware553-3202-210 Standard October 19989 If all the hardware components appear to be in order, repack them

Pagina 43

119Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 8: Hardware installationprocedures!CAUTIONRisk of data lossEnsure tha

Pagina 44

120 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Installing the IPE ModuleThe following procedure for installin

Pagina 45 - Controlled Routing

Chapter 8: Hardware installation procedures 121Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 28Default DCE/DTE setting

Pagina 46 - Figure 4

xiv Contents553-3202-210 Standard October 1998

Pagina 47 - Figure 5

122 Chapter 8: Hardware installation procedures553-3202-210 Standard October 19983 Slowly slide the module along the slots into the shelf or ca

Pagina 48 - CCR application

Chapter 8: Hardware installation procedures 123Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 30Port configuration set

Pagina 49 - Operating system

124 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Figure 30Port configuration settings (Part 2)1J813214113214J9P

Pagina 50 - Application Module Link

Chapter 8: Hardware installation procedures 125Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideInstalling the Application Modu

Pagina 51 - Consoles/printers

126 Chapter 8: Hardware installation procedures553-3202-210 Standard October 19986 Plug the power harness into the connector on the MPDU (P3 if

Pagina 52

Chapter 8: Hardware installation procedures 127Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideInstalling the power supply and

Pagina 53

128 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Figure 32Disk/tape unitMVME147or167MVME333-2MVME332XTSDisk/tap

Pagina 54

Chapter 8: Hardware installation procedures 129Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChecking the card option settin

Pagina 55

130 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998If your Application Module does not have CCR activated, theMVM

Pagina 56

Chapter 8: Hardware installation procedures 131Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 31MVME333-2 XCC card jump

Pagina 57

xvMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideAbout this guideThis document details the steps and procedures required to suc

Pagina 58 - Option 11 main cabinet

132 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998¥ Unplug the power harness from the connector (P3 or P4) on th

Pagina 59 - Connector

Chapter 8: Hardware installation procedures 133Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 33MVME705B jumper setting

Pagina 60

134 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Table 36Default DCE/DTE settings for MVME712M transition cardS

Pagina 61 - 11 12 13 14 15 16 17 18 19 20

Chapter 8: Hardware installation procedures 135Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideNote: A connector housing sur

Pagina 62 - IPE Module Options 21Ð81

136 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Figure 33MVME332XTS transition card serial port configuration1

Pagina 63

Chapter 8: Hardware installation procedures 137Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 34MVME333-2 transition c

Pagina 64 - IPE Module components

138 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Figure 35MVME705B transition card serial port configurationP13

Pagina 65

Chapter 8: Hardware installation procedures 139Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 36MVME712AM transition c

Pagina 66 - Figure 12

140 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Figure 37MVME712A transition card configurationSP1ConsoleSP3(t

Pagina 67

Chapter 8: Hardware installation procedures 141Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 38MVME712M card with jum

Pagina 68

xvi About this guide553-3202-210 Standard October 1998Chapter 3: Overview of Customer Controlled Routing This chapterprovides an overview of C

Pagina 69

142 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Installing an NTAK02 SDI/DCH cardOn an Option 11 system, if th

Pagina 70

Chapter 8: Hardware installation procedures 143Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 38NTAK02 SDI/DCH card jum

Pagina 71 - AEM power

144 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Figure 39NTAK02 SDI/DCH card jumper and switch locationsSW1Uni

Pagina 72 - Application Module components

Chapter 8: Hardware installation procedures 145Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideInstalling an ESDI or MSDL card

Pagina 73 - Risk of hardware damage

146 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Note: If the Single Terminal Access (STA) feature is present,

Pagina 74 - Application ModuleÑfront view

Chapter 8: Hardware installation procedures 147Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 40NT6D80 MSDL card jumpe

Pagina 75 - Power sense card

148 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998Table 40 (Part 1)Program socket selectionOption Port no. Socke

Pagina 76

Chapter 8: Hardware installation procedures 149Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 41QPC513 ESDI card jumpe

Pagina 77

150 Chapter 8: Hardware installation procedures553-3202-210 Standard October 1998

Pagina 78

151Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 9: Meridian Link/CCR interfacecablingThe cable requirements for the I

Pagina 79 - Figure 16

About this guide xviiMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 13: Meridian Mail configuration This chapter sho

Pagina 80

152 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 42NT1R03AA and NT1R03BA IPE Module cables15-pinEthern

Pagina 81

Chapter 9: Meridian Link/CCR interface cabling 153Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 41IPE Module cablesPar

Pagina 82

154 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998External I/O cablesTable 42 lists external I/O cables that c

Pagina 83 - Figure 17

Chapter 9: Meridian Link/CCR interface cabling 155Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideExternal I/O cable pinouts (

Pagina 84

156 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 43NT1R03D cable pinouts (IPE Module)Port pin SignalExt

Pagina 85 - Figure 18

Chapter 9: Meridian Link/CCR interface cabling 157Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 44NT1R03E cable pinout

Pagina 86

158 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 45NT1R03HF cable pinouts (IPE Module)Port pin SignalEx

Pagina 87 - Figure 19

Chapter 9: Meridian Link/CCR interface cabling 159Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 46NT1R03AA 50-pin four

Pagina 88

160 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 47NT1R03BA 50-pin four-port cable pinout (IPE Module)F

Pagina 89 - Figure 20

Chapter 9: Meridian Link/CCR interface cabling 161Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 48NT1R03CA 50-pin four

Pagina 90

xviii About this guide553-3202-210 Standard October 1998ReferencesRefer to the following related documents:¥ Application Equipment Module Insta

Pagina 91 - Figure 21

162 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 49NT8D93A cable pinout (IPE Module)25-pinconnectorSign

Pagina 92

Chapter 9: Meridian Link/CCR interface cabling 163Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 50NT8D82 cable pinout

Pagina 93 - Figure 22

164 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 50NT8D82 cable pinout (IPE Module) (continued)25-pin c

Pagina 94

Chapter 9: Meridian Link/CCR interface cabling 165Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 52NTND27AB cable pinou

Pagina 95 - NT6D51AA

166 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 53NTAK19AA cable pinout (IPE Module)Meridian 1 Signal

Pagina 96 - P2 adapter board

Chapter 9: Meridian Link/CCR interface cabling 167Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 54NTAK19BA cable pinou

Pagina 97 - Power supply

168 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 54NTAK19BA cable pinout (IPE Module) (continued)Meridi

Pagina 98 - Disk/tape unit

Chapter 9: Meridian Link/CCR interface cabling 169Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSDI and ESDI/MSDL cabling (O

Pagina 99 - Figure 26

170 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 43IPE Module Option 11 connections (Part 1)Note 1:Not

Pagina 100

Chapter 9: Meridian Link/CCR interface cabling 171Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 43IPE Module Option 1

Pagina 101 - Input/output panel

1Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 1: Meridian Link/CCRco-residencyCo-residency overviewWith Meridian Link

Pagina 102

172 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Meridian Mail cabling (IPE Module)The Meridian Link applicat

Pagina 103 - Figure 28

Chapter 9: Meridian Link/CCR interface cabling 173Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideESDI/MSDL cabling (Options 2

Pagina 104 - Figure 29

174 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998SDI Paddle Board cabling (Options 21Ð81 IPE Module only)Port

Pagina 105 - Preparing for installation

Chapter 9: Meridian Link/CCR interface cabling 175Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 45I/O cabling to Meri

Pagina 106 - Application Module

176 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 46I/O cabling to Meridian 1 (SDI and ESDI) (Options 2

Pagina 107

Chapter 9: Meridian Link/CCR interface cabling 177Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideCabling the Option 11 IPE Mo

Pagina 108

178 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 47Option 11 system IPE Module connectionsConnectorpan

Pagina 109 - General information

Chapter 9: Meridian Link/CCR interface cabling 179Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 48Option 11 main cabi

Pagina 110 - Distributor

180 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 56Option 11 IPE ModuleÑNT1R03AA/NT1R03CA cable connect

Pagina 111 - Delivery information

Chapter 9: Meridian Link/CCR interface cabling 181Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide4 Connect the NT1R03CA exten

Pagina 112 - Loading equipment required

ii553-3202-210 Standard October 1998

Pagina 113

2 Chapter 1: Meridian Link/CCR co-residency553-3202-210 Standard October 1998Figure 1Meridian Link/CCR co-residencyMeridian LinkCCRIPE ModuleMe

Pagina 114

182 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 19985 Connect the ports of octopus cable NT1R03AA to externalequ

Pagina 115 - Requirements for CCR

Chapter 9: Meridian Link/CCR interface cabling 183Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 61Option 11 IPE Module

Pagina 116

184 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 63X.25 Host Link cable pinoutIPE Module Signal Host Co

Pagina 117

Chapter 9: Meridian Link/CCR interface cabling 185Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideBackplane cable rerouting fo

Pagina 118

186 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998has three 20-pin connectors (only 16 pins are used) labelled

Pagina 119

Chapter 9: Meridian Link/CCR interface cabling 187Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideBackplane cable rerouting fo

Pagina 120

188 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 64 lists cable connections before cable expansion. Fig

Pagina 121 - Documentation

Chapter 9: Meridian Link/CCR interface cabling 189Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideCabling for the first four P

Pagina 122 - Hardware

190 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 19988 Move cable end H-3 from slot position L8-1 to slot positio

Pagina 123 - Equipment room information

Chapter 9: Meridian Link/CCR interface cabling 191Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 65NT8D11 cable connect

Pagina 124

Chapter 1: Meridian Link/CCR co-residency 3Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideThis guide provides more detailed i

Pagina 125 - Equipment cabling

192 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998NT8D11 backplane cable reroutingÑto accommodate the IPEModul

Pagina 126 - Peripheral device cabling

Chapter 9: Meridian Link/CCR interface cabling 193Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 66 lists cable connect

Pagina 127

194 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 51NT8D11 backplane cable designations (rerouted for s

Pagina 128

Chapter 9: Meridian Link/CCR interface cabling 195Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideBackplane cable rerouting fo

Pagina 129 - Telephony connections

196 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 67NT8D37 cable connections (standard configuration) (c

Pagina 130 - Additional considerations

Chapter 9: Meridian Link/CCR interface cabling 197Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 52NT8D37 backplane ca

Pagina 131 - Comments and recommendations

198 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998NT8D37 backplane cable expansionÑsegment 0With the cables lo

Pagina 132

Chapter 9: Meridian Link/CCR interface cabling 199Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideNT8D37 backplane cable expan

Pagina 133

200 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 68NT8D37 cable connections (fully expanded configurati

Pagina 134

Chapter 9: Meridian Link/CCR interface cabling 201Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 68NT8D37 cable connect

Pagina 135

4 Chapter 1: Meridian Link/CCR co-residency553-3202-210 Standard October 1998KeycodeIPE or Application Module software may or may not be pre-lo

Pagina 136

202 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 68NT8D37 cable connections (fully expanded configurati

Pagina 137 - Risk of data loss

Chapter 9: Meridian Link/CCR interface cabling 203Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideNT8D37 backplane cable rerou

Pagina 138 - Installing the IPE Module

204 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 69 lists cable connections for an IPE shelf with segme

Pagina 139

Chapter 9: Meridian Link/CCR interface cabling 205Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 69NT8D37 cable connect

Pagina 140

206 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 54NT8D11 backplane cable designations (segment 0 has

Pagina 141 - Figure 30

Chapter 9: Meridian Link/CCR interface cabling 207Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideNT8D37 backplane cable rerou

Pagina 142

208 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998NT8D37 backplane cable rerouting for segment 3Ñtoaccommodate

Pagina 143

Chapter 9: Meridian Link/CCR interface cabling 209Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideCabling the Options 21Ð81 IP

Pagina 144

210 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 55Options 21Ð81 system IPE Module connectionsNT1R03AA

Pagina 145 - (Application Module)

Chapter 9: Meridian Link/CCR interface cabling 211Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideUse the following procedure

Pagina 146

Chapter 1: Meridian Link/CCR co-residency 5Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideEthernet LAN-based PCMeridian Link

Pagina 147 - Risk of personal injury

212 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 70Option 21 CE/PE cabinet connectorsSlots occupied byt

Pagina 148

Chapter 9: Meridian Link/CCR interface cabling 213Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide3 Connect the ports of cable

Pagina 149

214 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 73Options 21Ð81 IPE Module external connections (NT1R0

Pagina 150

Chapter 9: Meridian Link/CCR interface cabling 215Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 75X.25 Host Link cable

Pagina 151

216 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Application Module cablingTwo types of cables interconnect A

Pagina 152

Chapter 9: Meridian Link/CCR interface cabling 217Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 76Power harness cables

Pagina 153

218 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 57Power harness wiring diagram (Application Module)Po

Pagina 154

Chapter 9: Meridian Link/CCR interface cabling 219Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideInput/output cablesThe Appli

Pagina 155

220 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 58Internal I/O cabling (Application Module)MVME147/16

Pagina 156 - Figure 35

Chapter 9: Meridian Link/CCR interface cabling 221Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideExternal I/O cables (Applica

Pagina 157 - Figure 36

6 Chapter 1: Meridian Link/CCR co-residency553-3202-210 Standard October 1998The Ethernet LAN-based PC must¥ be fully compatible with an IBM PC

Pagina 158 - Figure 37

222 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 79Cables from transition cards to the universal I/O pa

Pagina 159

Chapter 9: Meridian Link/CCR interface cabling 223Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 80Cables from transiti

Pagina 160

224 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 81Cables to external equipment (Application Module)Par

Pagina 161

Chapter 9: Meridian Link/CCR interface cabling 225Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 81Cables to external e

Pagina 162 - Figure 39

226 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 81Cables to external equipment (Application Module) (c

Pagina 163

Chapter 9: Meridian Link/CCR interface cabling 227Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideCabling the Application Modu

Pagina 164

228 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 19982 If you are using an MVME712AM transition card, skip this s

Pagina 165 - Figure 40

Chapter 9: Meridian Link/CCR interface cabling 229Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide5 To connect the MSDL port t

Pagina 166

230 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 19988 For the X.25 host link, connect a customer-supplied cable

Pagina 167 - Figure 41

Chapter 9: Meridian Link/CCR interface cabling 231Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 59I/O subpanel connec

Pagina 168

Chapter 1: Meridian Link/CCR co-residency 7Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFor Ethernet LAN support, Applicati

Pagina 169 - IPE Module cabling

232 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 60I/O subpanel connectors (CCR)J9 J8 J7J6 J5 J4J3 J2

Pagina 170

Chapter 9: Meridian Link/CCR interface cabling 233Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 61Universal I/O panel

Pagina 171

234 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 62Universal I/O panel (CCR)INTMODEMSDILINKEXTMODEMSYS

Pagina 172 - External I/O cables

Chapter 9: Meridian Link/CCR interface cabling 235Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 63Generic I/O panel (

Pagina 173

236 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 64Generic I/O panel (CCR)CARD 1CONN 4CARD 1CONN 3ETHE

Pagina 174

Chapter 9: Meridian Link/CCR interface cabling 237Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 65Application Module

Pagina 175

238 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 66Application Module MVME712AM and MVME705B I/O cabli

Pagina 176

Chapter 9: Meridian Link/CCR interface cabling 239Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 67Application Module

Pagina 177

240 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 68Application Module MVME712AM, MVME705B, NT6D51AA ca

Pagina 178

Chapter 9: Meridian Link/CCR interface cabling 241Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 69Application Module

Pagina 179

8 Chapter 1: Meridian Link/CCR co-residency553-3202-210 Standard October 1998The module address is a 4-byte (32-bit) address expressed as four

Pagina 180

242 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 70Application Module external I/O cabling to and from

Pagina 181

Chapter 9: Meridian Link/CCR interface cabling 243Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 71Application Module

Pagina 182

244 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 72Application Module external cabling to and from gen

Pagina 183

Chapter 9: Meridian Link/CCR interface cabling 245Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 73I/O cabling to Meri

Pagina 184

246 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Figure 74I/O cabling to Meridian 1 (SDI and MSDL) (Applicati

Pagina 185

Chapter 9: Meridian Link/CCR interface cabling 247Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideESDI/MSDL cabling (Applicati

Pagina 186

248 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998System console cabling (Application Module)As shown in Figur

Pagina 187

Chapter 9: Meridian Link/CCR interface cabling 249Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideHost computer cabling (Appli

Pagina 188 - Method 2

250 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998SDI cabling (Application Module)As shown in Figures 73 and 7

Pagina 189 - Method 3

Chapter 9: Meridian Link/CCR interface cabling 251Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSDI Paddle Board cabling (Ap

Pagina 190 - Figure 44

9Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 2: Overview of Meridian LinkMeridian Link is an application that allows

Pagina 191

252 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 88Pinout of SDI Paddle Board J1 connectorPin Number Si

Pagina 192

Chapter 9: Meridian Link/CCR interface cabling 253Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideInternal modem cabling (MVME

Pagina 193 - Figure 45

254 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Meridian Mail cabling (Application Module)The Meridian Link

Pagina 194 - Figure 46

Chapter 9: Meridian Link/CCR interface cabling 255Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideMeridian Mail Modular Option

Pagina 195 - Cabling to external equipment

256 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 19987 Power up the Application Module.8 Define the Meridian Mail

Pagina 196 - Figure 47

Chapter 9: Meridian Link/CCR interface cabling 257Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideBefore you install Ethernet

Pagina 197 - 012345678 9

258 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998To set up an Ethernet connection, use the following procedur

Pagina 198

Chapter 9: Meridian Link/CCR interface cabling 259Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide10 At step 21 of Procedure 8

Pagina 199

260 Chapter 9: Meridian Link/CCR interface cabling553-3202-210 Standard October 1998Table 93NT7D47DA cable pinoutP1 end P2 end11223355669910 101

Pagina 200

261Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 10: Installing peripheral devicesYou should use this chapter in conju

Pagina 201

10 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Figure 2Meridian Link hardware connections (IPE Module)Meridian 1Unive

Pagina 202

262 Chapter 10: Installing peripheral devices553-3202-210 Standard October 1998The setup procedure is the same for all three terminals and is as

Pagina 203 - IPE backplanes

Chapter 10: Installing peripheral devices 263Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 95VT220 Setup valuesSet-Up

Pagina 204 - Risk of equipment damage

264 Chapter 10: Installing peripheral devices553-3202-210 Standard October 1998Table 96VT320 Setup valuesSet-Up DirectoryOn LineDisplay Set-Up80

Pagina 205

Chapter 10: Installing peripheral devices 265Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 97VT420 Setup valuesGlobal

Pagina 206

266 Chapter 10: Installing peripheral devices553-3202-210 Standard October 1998Personal computer running Reflection 4+Reflection 4+ is a custome

Pagina 207

Chapter 10: Installing peripheral devices 267Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide7 If you need to quit Reflection

Pagina 208

268 Chapter 10: Installing peripheral devices553-3202-210 Standard October 1998Dot-matrix printer switch settingsThe HP Rugged Writer is a dot-m

Pagina 209

Chapter 10: Installing peripheral devices 269Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideLaserJet series II printer switch

Pagina 210

270 Chapter 10: Installing peripheral devices553-3202-210 Standard October 1998LaserJet series III printer switch settingsUse the [Menu] key on

Pagina 211

Chapter 10: Installing peripheral devices 271Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideLaserJet series IV printer switch

Pagina 212 - C9 C8 C7 C6 C5 C4 C3 C2 C1 C0

Chapter 2: Overview of Meridian Link 11Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 3Meridian Link hardware connectio

Pagina 213

272 Chapter 10: Installing peripheral devices553-3202-210 Standard October 1998DeskJet and DeskJet 500 printer switch settingsThe DeskJet and De

Pagina 214

273Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 11: Peripheral device cablinginterfaceYou should use this chapter in

Pagina 215

274 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998¥ using a null-modem cable A null-modem cable (a special

Pagina 216

Chapter 11: Peripheral device cabling interface 275Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 80Null modem RS-232

Pagina 217

276 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Using an A/B switchbox to share system consolesYou can use

Pagina 218

Chapter 11: Peripheral device cabling interface 277Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideUsing the A/B switchbox to

Pagina 219

278 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998ModemsModems are used to connect peripheral devices (termi

Pagina 220

Chapter 11: Peripheral device cabling interface 279Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideUSRobotics Sportster modemT

Pagina 221

280 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Gandalf LDS 120E limited-distance modemThe Gandalf LDS 120

Pagina 222

Chapter 11: Peripheral device cabling interface 281Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 81Hardware configura

Pagina 223

iiiMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuidePublication historyOctober 1998Standard 1.0

Pagina 224

12 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Connecting these hardware components requires two (optionally three)si

Pagina 225

282 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Dial-up modemIf you want to dial up to ports on the IPE Mo

Pagina 226

Chapter 11: Peripheral device cabling interface 283Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfiguring the UDS 2440 mo

Pagina 227

284 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Table 103UDS 2440 modem configuration (front panel buttons

Pagina 228 - Figure 55

Chapter 11: Peripheral device cabling interface 285Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 103UDS 2440 modem con

Pagina 229 - Right I/O panel

286 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Table 103UDS 2440 modem configuration (front panel buttons

Pagina 230

Chapter 11: Peripheral device cabling interface 287Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide4 Connect the modem directl

Pagina 231

288 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Figure 84Universal Data Systems (UDS) EC224A/D modemÑswitc

Pagina 232

Chapter 11: Peripheral device cabling interface 289Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 87Ven-Tel 2400 modem

Pagina 233

290 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Figure 88Ven-Tel 2400 Plus II modemÑopening the modem¥Mode

Pagina 234 - Application Module cabling

Chapter 11: Peripheral device cabling interface 291Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 90Ven-Tel 2400 Plus

Pagina 235

Chapter 2: Overview of Meridian Link 13Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideMeridian Link applicationThe Meridian Li

Pagina 236 - Figure 57

292 Chapter 11: Peripheral device cabling interface553-3202-210 Standard October 1998Figure 92Ven-Tel 9600 Plus modemÑswitch locations and sett

Pagina 237 - Input/output cables

293Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 12: Meridian 1 configuration forMeridian Link/CCRYou should use this

Pagina 238 - Figure 58

294 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 105 presents some of these conventions.Tab

Pagina 239

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 295Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfiguration ov

Pagina 240

296 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Configuring the VSID, HSID, and AML promptsWhen

Pagina 241

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 297Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide¥ A Meridian 1 w

Pagina 242

298 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998¥ A Meridian 1 with a single IPE Module or Appli

Pagina 243

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 299Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfigure ESDI p

Pagina 244

300 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 106LD 17ÑConfigure ESDI port (Options 21Ð8

Pagina 245

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 301Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 106LD 17ÑC

Pagina 246

14 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998New with Meridian Link Release 5CThe Meridian Link Release 5C introduc

Pagina 247

302 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Enable ESDI port (X81 phase 7 or X11 Release 17)

Pagina 248

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 303Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 107LD 48ÑL

Pagina 249

304 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 107LD 48ÑLink Diagnostic (continued)Comman

Pagina 250 - J3 J2 J1

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 305Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfigure ESDI o

Pagina 251 - Figure 61

306 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 108LD 17ÑConfigure ESDI or MSDL port (Opti

Pagina 252 - Universal I/O panel (CCR)

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 307Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 108LD 17ÑC

Pagina 253 - Figure 63

308 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Option 21Ð81 ESDI or MSDL configurationTable 109

Pagina 254 - Generic I/O panel (CCR)

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 309Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 109LD 17ÑC

Pagina 255

310 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 109LD 17ÑConfigure ESDI or MSDL port (Opti

Pagina 256

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 311Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 109LD 17ÑC

Pagina 257

Chapter 2: Overview of Meridian Link 15Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSFN (login) message with agent ID This

Pagina 258

312 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Enable ESDI or MSDL port (X11 Release 18 or late

Pagina 259

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 313Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 110LD 48ÑL

Pagina 260

314 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 110LD 48ÑLink Diagnostic (continued)Comman

Pagina 261

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 315Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfigure SDI po

Pagina 262

316 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 111LD 17ÑConfigure SDI port (X11 Release 1

Pagina 263 - Figure 73

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 317Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfigure SDI po

Pagina 264 - Figure 74

318 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Enable SDI portSome commands in LD 37 require a

Pagina 265

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 319Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfiguring DNIS

Pagina 266

320 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998LD 16ÑRoute data blockLD 16 defines the route (T

Pagina 267

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 321Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 115LD 16ÑT

Pagina 268

16 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Note: When setting up a redundant Meridian Link, twocommunication pa

Pagina 269

322 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998LD 14ÑTrunk data blockThe pre-specified DN (auto

Pagina 270

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 323Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 116LD 14ÑC

Pagina 271

324 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Configuring DNIS to use Incoming Digit Conversio

Pagina 272

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 325Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideIn order for DNI

Pagina 273

326 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998X11 Release 23 allows 7 full digits of DNIS info

Pagina 274

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 327Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 119LD 49ÑD

Pagina 275

328 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998If, in a block of DNIS numbers, all numbers star

Pagina 276

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 329Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideIf the last digi

Pagina 277

330 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Configure devices for status change host notific

Pagina 278

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 331Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideNote: The Unri

Pagina 279 - Risk of potential data loss

Chapter 2: Overview of Meridian Link 17Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSystem console and maintenance consoleYo

Pagina 280

332 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998initiate a conference, the application receives

Pagina 281

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 333Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideDefine status me

Pagina 282

334 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 122LD 15ÑDefine status message groups (con

Pagina 283 - VT420 Setup values

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 335Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideAssign telephone

Pagina 284

336 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 123LD 23ÑBuild ACD groups (continued)Promp

Pagina 285

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 337Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideDefine ACD telep

Pagina 286

338 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 124LD 10ÑDefine single-line ACD telephones

Pagina 287

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 339Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 125LD 11ÑD

Pagina 288

340 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 125LD 11ÑDefine multi-line ACD telephones

Pagina 289

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 341Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideDefine non-ACD t

Pagina 290 - Figure 78

18 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998You can also use commands to do the following:¥ back up and restore co

Pagina 291 - DCE and DTE connections

342 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 127LD 11ÑDefine multi-line telephones as A

Pagina 292

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 343Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 127LD 11ÑD

Pagina 293 - DCE device at each end

344 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Configure ACD DNsTwo types of ACD DNs are descri

Pagina 294 - Connecting the A/B switchbox

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 345Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideNote: Systems

Pagina 295

346 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Configure Control DNs (CCR)A Control DN (CDN) is

Pagina 296 - Limited-distance modem

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 347Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 130LD 23ÑD

Pagina 297 - USRobotics Sportster modem

348 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 130LD 23ÑDefine CDNs (continued)Prompt Res

Pagina 298

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 349Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfiguring a Ph

Pagina 299

350 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Configuring a Phantom SuperloopA phantom superlo

Pagina 300 - Dial-up modem

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 351Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideCreating a Phant

Pagina 301

Chapter 2: Overview of Meridian Link 19Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideÑ QPC513 Enhanced Serial Data Interface

Pagina 302

352 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Table 133LD 10ÑCreating a Phantom Set (continued

Pagina 303

Chapter 12: Meridian 1 configuration for Meridian Link/CCR 353Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConfiguring Dual

Pagina 304

354 Chapter 12: Meridian 1 configuration for Meridian Link/CCR553-3202-210 Standard October 1998Traffic statisticsLD 2 is used to set and schedu

Pagina 305

355Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 13: Meridian Mail configurationHost Enhanced Voice Processing (HEVP)

Pagina 306

356 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998This chapter provides¥ a brief overview of how the Meridian 1 syste

Pagina 307 - Figure 87

Chapter 13: Meridian Mail configuration 357Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideMeridian Mail call processingFigur

Pagina 308

358 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998Configuring Meridian 1 for Meridian MailTo configure the Meridian 1

Pagina 309

Chapter 13: Meridian Mail configuration 359Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 136LD 23ÑCreating an ACD que

Pagina 310

360 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998Defining virtual agent DNs for voice channelsFor each voice channel

Pagina 311 - Meridian Link/CCR

Chapter 13: Meridian Mail configuration 361Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 137LD 11ÑDefining virtual ag

Pagina 312

20 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Table 1Hardware supported for Meridian Link and CCRApplication MVME147

Pagina 313 - Configuration overview

362 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998Table 137LD 11ÑDefining virtual agent DNs for voice channels (conti

Pagina 314

Chapter 13: Meridian Mail configuration 363Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 137LD 11ÑDefining virtual ag

Pagina 315

364 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998When adding an ACD DN for Meridian Link-based HEVP applications int

Pagina 316

Chapter 13: Meridian Mail configuration 365Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 138Example of Meridian Mail

Pagina 317

366 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998Defining voice channels in the Channel Allocation Table(CAT)The Cha

Pagina 318

Chapter 13: Meridian Mail configuration 367Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 139Example of Meridian Mail

Pagina 319

368 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 199813 Set the Service to ACC.14 Set the Channel class to an unused cla

Pagina 320

Chapter 13: Meridian Mail configuration 369Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 95Meridian Mail Add Local V

Pagina 321

370 Chapter 13: Meridian Mail configuration553-3202-210 Standard October 1998

Pagina 322

371Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 14: Software installation,upgrade, and update proceduresThis chapter

Pagina 323 - Option 11 ESDI configuration

Chapter 2: Overview of Meridian Link 21Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSoftware overviewThe Meridian 1 must be

Pagina 324

372 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998The keycode is provided as part of the so

Pagina 325

Chapter 14: Software installation, upgrade, and update procedures 373Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 140

Pagina 326

374 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Table 140Software upgrade paths (continue

Pagina 327

Chapter 14: Software installation, upgrade, and update procedures 375Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTo config

Pagina 328

376 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Section 1: To upgrade Meridian Link from

Pagina 329

Chapter 14: Software installation, upgrade, and update procedures 377Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSection 2

Pagina 330

378 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Section 3: To upgrade Meridian Link from

Pagina 331

Chapter 14: Software installation, upgrade, and update procedures 379Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSection 4

Pagina 332

380 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Section 5: To upgrade Meridian Link from

Pagina 333

Chapter 14: Software installation, upgrade, and update procedures 381Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSection 6

Pagina 334

iv Publication history553-3202-210 Standard October 1998

Pagina 335

22 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Table 2X11 software compatibility matrixApplication Rls. 17 Rls. 18 Rl

Pagina 336 - Enable SDI port

382 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Section 7: To update Meridian Link from R

Pagina 337 - LD 15ÑCustomer data block

Chapter 14: Software installation, upgrade, and update procedures 383Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSection 9

Pagina 338 - LD 16ÑRoute data block

384 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Section 10: To update CCR from Release 3

Pagina 339

Chapter 14: Software installation, upgrade, and update procedures 385Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSection 1

Pagina 340 - LD 14ÑTrunk data block

386 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998If the release or issue of BOS changes,¥

Pagina 341

Chapter 14: Software installation, upgrade, and update procedures 387Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide¥ Dependi

Pagina 342

388 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 1: Application configuration an

Pagina 343

Chapter 14: Software installation, upgrade, and update procedures 389Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 344

390 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 1: Application configuration an

Pagina 345

Chapter 14: Software installation, upgrade, and update procedures 391Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 346

Chapter 2: Overview of Meridian Link 23Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideHostThis section describes the services

Pagina 347

392 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 1: Application configuration an

Pagina 348

Chapter 14: Software installation, upgrade, and update procedures 393Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 349

394 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 1: Application configuration an

Pagina 350

Chapter 14: Software installation, upgrade, and update procedures 395Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 351 - Define status message groups

396 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 1: Application configuration an

Pagina 352

Chapter 14: Software installation, upgrade, and update procedures 397Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 353

398 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 2: Start the update process (co

Pagina 354

Chapter 14: Software installation, upgrade, and update procedures 399Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 355 - Define ACD telephones as AST

400 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 3: Load application software fr

Pagina 356

Chapter 14: Software installation, upgrade, and update procedures 401Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 357

24 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Host connection considerationsThe link to the host computer should be

Pagina 358

402 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 3: Load application software fr

Pagina 359

Chapter 14: Software installation, upgrade, and update procedures 403Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 360

404 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 3: Load application software fr

Pagina 361

Chapter 14: Software installation, upgrade, and update procedures 405Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 362 - Configure ACD DNs

406 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 3: Load application software fr

Pagina 363

Chapter 14: Software installation, upgrade, and update procedures 407Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 364 - Configure Control DNs (CCR)

408 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 3: Load application software fr

Pagina 365

Chapter 14: Software installation, upgrade, and update procedures 409Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 366

410 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 3: Load application software fr

Pagina 367 - Configuring a Phantom Loop

Chapter 14: Software installation, upgrade, and update procedures 411Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 368

Chapter 2: Overview of Meridian Link 25Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideEthernet support is automatically enable

Pagina 369 - Creating a Phantom Set

412 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 4: Power down the IPE Module or

Pagina 370

Chapter 14: Software installation, upgrade, and update procedures 413Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 371 - Configuring Dual VAS ID

414 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 372 - Traffic statistics

Chapter 14: Software installation, upgrade, and update procedures 415Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 373

416 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 374

Chapter 14: Software installation, upgrade, and update procedures 417Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 375 - Meridian Mail call processing

418 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 376

Chapter 14: Software installation, upgrade, and update procedures 419Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 377

420 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 378

Chapter 14: Software installation, upgrade, and update procedures 421Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 379

26 Chapter 2: Overview of Meridian Link553-3202-210 Standard October 1998Meridian Mail software requirementsA Meridian Mail system can be conne

Pagina 380

422 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 381 - Processing (HEVP)

Chapter 14: Software installation, upgrade, and update procedures 423Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 382

424 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 383

Chapter 14: Software installation, upgrade, and update procedures 425Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 384

426 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 385

Chapter 14: Software installation, upgrade, and update procedures 427Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 386

428 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 5: Load the operating system ta

Pagina 387

Chapter 14: Software installation, upgrade, and update procedures 429Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 388

430 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 389

Chapter 14: Software installation, upgrade, and update procedures 431Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 390

27Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 3: Overview of CustomerControlled RoutingCustomer Controlled Routing (

Pagina 391

432 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 392

Chapter 14: Software installation, upgrade, and update procedures 433Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 393

434 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 394

Chapter 14: Software installation, upgrade, and update procedures 435Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 395

436 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 396 - Release 5C

Chapter 14: Software installation, upgrade, and update procedures 437Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 397 - Co-residency

438 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 398

Chapter 14: Software installation, upgrade, and update procedures 439Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 399 - Release 5C and Co-residency

440 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 400

Chapter 14: Software installation, upgrade, and update procedures 441Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 401

28 Chapter 3: Overview of Customer Controlled Routing553-3202-210 Standard October 1998Figure 4CCR hardware connections (IPE Module)TerminalLAN

Pagina 402

442 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 403

Chapter 14: Software installation, upgrade, and update procedures 443Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 404 - CCR feature

444 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 405

Chapter 14: Software installation, upgrade, and update procedures 445Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 406 - 1 ID of this site

446 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 6: Load the operating system ta

Pagina 407

Chapter 14: Software installation, upgrade, and update procedures 447Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 408

448 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 7: Reboot and go through setupI

Pagina 409

Chapter 14: Software installation, upgrade, and update procedures 449Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 410

450 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 7: Reboot and go through setup

Pagina 411 - ATTENTION

Chapter 14: Software installation, upgrade, and update procedures 451Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 412

Chapter 3: Overview of Customer Controlled Routing 29Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 5CCR hardware conn

Pagina 413

452 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 7: Reboot and go through setup

Pagina 414

Chapter 14: Software installation, upgrade, and update procedures 453Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 415

454 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 7: Reboot and go through setup

Pagina 416

Chapter 14: Software installation, upgrade, and update procedures 455Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 417 - This side in

456 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 7: Reboot and go through setup

Pagina 418 - Application tape

Chapter 14: Software installation, upgrade, and update procedures 457Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 419

458 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 420 - (or Q or q to quit)

Chapter 14: Software installation, upgrade, and update procedures 459Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 421

460 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 422

Chapter 14: Software installation, upgrade, and update procedures 461Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 423

30 Chapter 3: Overview of Customer Controlled Routing553-3202-210 Standard October 1998CCR applicationCCR works with the Automatic Call Distrib

Pagina 424

462 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 425

Chapter 14: Software installation, upgrade, and update procedures 463Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 426

464 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 427

Chapter 14: Software installation, upgrade, and update procedures 465Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 428 - (diagnostic messages)

466 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 429

Chapter 14: Software installation, upgrade, and update procedures 467Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 430

468 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 431

Chapter 14: Software installation, upgrade, and update procedures 469Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 432

470 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 8: Load the application softwar

Pagina 433

Chapter 14: Software installation, upgrade, and update procedures 471Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 434 - <cr>

Chapter 3: Overview of Customer Controlled Routing 31Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide¥ For elite clients Any

Pagina 435

472 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 9: Restore configuration files

Pagina 436 - Tape drive

Chapter 14: Software installation, upgrade, and update procedures 473Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 437

474 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 9: Restore configuration files

Pagina 438

Chapter 14: Software installation, upgrade, and update procedures 475Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 439

476 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998Procedure 11: Back up configuration files

Pagina 440

Chapter 14: Software installation, upgrade, and update procedures 477Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure

Pagina 441

478 Chapter 14: Software installation, upgrade, and update procedures553-3202-210 Standard October 1998

Pagina 442

479Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 15: Link configurationThis chapter describes the initial configuratio

Pagina 443

480 Chapter 15: Link configuration553-3202-210 Standard October 1998Link 1ÑX.25 protocol (Meridian Link)Link 1 is defined as the host link using

Pagina 444

Chapter 15: Link configuration 481Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideLink 1ÑTCP/IP host link protocol (Meridian L

Pagina 445

vMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideContentsAbout this guide xvReferences xviiiChapter 1: Meridian Link/CCR 1Co-res

Pagina 446

32 Chapter 3: Overview of Customer Controlled Routing553-3202-210 Standard October 1998New with CCR Release 3CCCR Release 3C introduces the fol

Pagina 447 - MPU Clock Speed = 25Mhz

482 Chapter 15: Link configuration553-3202-210 Standard October 1998Changing your configurationUse the following procedures (as your requirement

Pagina 448 - (Type a period and press

Chapter 15: Link configuration 483Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 12: Verifying the link status1 Log

Pagina 449

484 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 13: Changing AML (link 0) parametersMeridian Link and CCR are ship

Pagina 450

Chapter 15: Link configuration 485Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 13: Changing AML (link 0) paramete

Pagina 451

486 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 13: Changing AML (link 0) parameters (continued)Table 141AML (link

Pagina 452

Chapter 15: Link configuration 487Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 13: Changing AML (link 0) paramete

Pagina 453

488 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 13: Changing AML (link 0) parameters (continued)Table 141AML (link

Pagina 454

Chapter 15: Link configuration 489Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 14: Changing Meridian Link (link 1

Pagina 455

490 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 14: Changing Meridian Link (link 1) parameters (continued)Table 14

Pagina 456

Chapter 15: Link configuration 491Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 14: Changing Meridian Link (link 1

Pagina 457

Chapter 3: Overview of Customer Controlled Routing 33Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideAn NT1R03D cable connects

Pagina 458

492 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 14: Changing Meridian Link (link 1) parameters (continued)Table 14

Pagina 459

Chapter 15: Link configuration 493Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 14: Changing Meridian Link (link 1

Pagina 460

494 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 14: Changing Meridian Link (link 1) parameters (continued)Table 14

Pagina 461

Chapter 15: Link configuration 495Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 14: Changing Meridian Link (link 1

Pagina 462

496 Chapter 15: Link configuration553-3202-210 Standard October 1998Table 143TCP/IP parametersÑLink 1Link parameter Allowed values(defaults in p

Pagina 463

Chapter 15: Link configuration 497Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 15: Changing Meridian Mail Link (l

Pagina 464

498 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 15: Changing Meridian Mail Link (link 2) parameters(continued)7 To

Pagina 465

Chapter 15: Link configuration 499Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 16: Replacing the default configur

Pagina 466

500 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 17: Creating a configuration fileMeridian Link and CCR are shipped

Pagina 467

Chapter 15: Link configuration 501Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 17: Creating a configuration file

Pagina 468

34 Chapter 3: Overview of Customer Controlled Routing553-3202-210 Standard October 1998Meridian 1This section provides overviews of the Meridia

Pagina 469

502 Chapter 15: Link configuration553-3202-210 Standard October 1998Procedure 17: Creating a configuration file (continued)Figure 263Change link

Pagina 470 - Portconfig messages

503Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 16: Additional applicationconfigurationIn addition to configuring the

Pagina 471

504 Chapter 16: Additional application configuration553-3202-210 Standard October 1998¥ perform Procedure 20: Schedule regular backups¥ perform

Pagina 472

Chapter 16: Additional application configuration 505Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 18: Turn off aut

Pagina 473

506 Chapter 16: Additional application configuration553-3202-210 Standard October 1998Procedure 19: Change the Meridian 1 customer numberWhen yo

Pagina 474

Chapter 16: Additional application configuration 507Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 20: Schedule reg

Pagina 475

508 Chapter 16: Additional application configuration553-3202-210 Standard October 1998Procedure 20: Schedule regular backups (continued)Figure 2

Pagina 476

Chapter 16: Additional application configuration 509Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 21: Change the d

Pagina 477

510 Chapter 16: Additional application configuration553-3202-210 Standard October 1998Procedure 21: Change the default system languages (continu

Pagina 478

Chapter 16: Additional application configuration 511Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 22: Configure te

Pagina 479

Chapter 3: Overview of Customer Controlled Routing 35Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideOption 11 systems support

Pagina 480

512 Chapter 16: Additional application configuration553-3202-210 Standard October 1998Procedure 22: Configuring terminal ports (continued)Figure

Pagina 481

Chapter 16: Additional application configuration 513Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 23: Configure pr

Pagina 482

514 Chapter 16: Additional application configuration553-3202-210 Standard October 1998Procedure 23: Configuring printer ports (continued)Figure

Pagina 483

Chapter 16: Additional application configuration 515Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 23: Configuring

Pagina 484

516 Chapter 16: Additional application configuration553-3202-210 Standard October 1998Procedure 23: Configuring printer ports (continued)11 Type

Pagina 485

517Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 17: Hardware upgradeThis chapter provides procedures to enable you to

Pagina 486

518 Chapter 17: Hardware upgrade553-3202-210 Standard October 1998Procedure 24: Software powerdown1 Log in as maint. The default password is mai

Pagina 487

Chapter 17: Hardware upgrade 519Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 24: Software powerdown (continued)Fi

Pagina 488

520 Chapter 17: Hardware upgrade553-3202-210 Standard October 1998Procedure 25: Hardware powerdown1 Complete Procedure 24: Software powerdown.2

Pagina 489 - Make sure tape is in drive

Chapter 17: Hardware upgrade 521Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideProcedure 26: Upgrading the Application Module

Pagina 490

36 Chapter 3: Overview of Customer Controlled Routing553-3202-210 Standard October 1998Software overviewThe Meridian 1 must be equipped with on

Pagina 491

522 Chapter 17: Hardware upgrade553-3202-210 Standard October 1998Procedure 27: Upgrading an Option 11 to an Options 21Ð81IPE ModuleThe Option 1

Pagina 492

Chapter 17: Hardware upgrade 523Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide13 Replace the six screws and flat washers, re

Pagina 493

524 Chapter 17: Hardware upgrade553-3202-210 Standard October 1998Procedure 28: Installing the cables for Ethernet LAN support(Application Modul

Pagina 494

Chapter 17: Hardware upgrade 525Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide8 Slide the Application Module back into place

Pagina 495

526 Chapter 17: Hardware upgrade553-3202-210 Standard October 1998Procedure 29: Installing the MVME332XT or MVME332XTSACC card1 Complete Procedu

Pagina 496

527Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 18: Acceptance testingThis chapter describes the various acceptance t

Pagina 497 - Default configuration

528 Chapter 18: Acceptance testing553-3202-210 Standard October 19984 Type exit and press [Return] to go to the ÒConsole Login:Ó prompt.CCR or M

Pagina 498

Chapter 18: Acceptance testing 529Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideMeridian MailThis section describes how you

Pagina 499

530 Chapter 18: Acceptance testing553-3202-210 Standard October 1998Recording and trimming voice segmentsIn Edit Voice, each voice segment has a

Pagina 500 - Changing your configuration

Chapter 18: Acceptance testing 531Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideUsing Edit Voice for the first timeThe first

Pagina 501

Chapter 3: Overview of Customer Controlled Routing 37Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide¥ Interactive Voice Respo

Pagina 502

532 Chapter 18: Acceptance testing553-3202-210 Standard October 1998Figure 297Example of Play Voice sessionCall Offered---><--- Answer Cal

Pagina 503

533Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 19: Single Terminal AccessThis chapter describes how to configure the

Pagina 504

534 Chapter 19: Single Terminal Access553-3202-210 Standard October 1998¥ one 25-pin straight-through cable for the STA terminal¥ the following

Pagina 505

Chapter 19: Single Terminal Access 535Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 298STA for Meridian Link/CCR on a

Pagina 506

536 Chapter 19: Single Terminal Access553-3202-210 Standard October 1998Figure 299STA for Meridian Link/CCR on an Application ModuleMini SCSIPor

Pagina 507 - (Meridian Link only)

Chapter 19: Single Terminal Access 537Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSetting up STA1 Access LD 22 to verify t

Pagina 508

538 Chapter 19: Single Terminal Access553-3202-210 Standard October 19988 Configure the MSDL port for STA. Define the port and itscharacteristic

Pagina 509

Chapter 19: Single Terminal Access 539Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide9 Verify the above configuration in LD 2

Pagina 510

540 Chapter 19: Single Terminal Access553-3202-210 Standard October 1998Table 148LD 17ÑConfigure MSDL portPrompt Response CommentREQ CHG Create

Pagina 511

Chapter 19: Single Terminal Access 541Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 301STAT STASTAT STA 0STA 00STAT:

Pagina 512

38 Chapter 3: Overview of Customer Controlled Routing553-3202-210 Standard October 1998

Pagina 513

542 Chapter 19: Single Terminal Access553-3202-210 Standard October 1998Figure 303STA Main MenuSTA Main MenuF6: View Port ConfigurationF7: Cha

Pagina 514

Chapter 19: Single Terminal Access 543Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 149Port configurationPrompt Respon

Pagina 515

544 Chapter 19: Single Terminal Access553-3202-210 Standard October 1998

Pagina 516

545Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 20: OrderingTable 150 lists field-replaceable Application Module item

Pagina 517

546 Chapter 20: Ordering553-3202-210 Standard October 1998Table 150Field-replaceable Application Module items (continued)Eng. code(if applicable

Pagina 518

Chapter 20: Ordering 547Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 150Field-replaceable Application Module items (c

Pagina 519

548 Chapter 20: Ordering553-3202-210 Standard October 1998Table 151Field-replaceable IPE Module items (continued)Eng. code(if applicable)Commonp

Pagina 520

Chapter 20: Ordering 549Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 151Field-replaceable IPE Module items (continued

Pagina 521

550 Chapter 20: Ordering553-3202-210 Standard October 1998Component failure ratesFailure rates for basic Application Module components in terms

Pagina 522

Chapter 20: Ordering 551Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 153IPE Module projected component failure ratesP

Pagina 523 - Auto start disabled

39Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 4: Meridian Link/CCR hardwareMeridian Link and CCR hardware consists o

Pagina 524 - Enter a return for no change

552 Chapter 20: Ordering553-3202-210 Standard October 1998

Pagina 525 - Enter return for no change

553Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideList of termsACDSee Automatic Call Distribution (ACD).ACD DNSee Automatic Cal

Pagina 526

554 List of terms553-3202-210 Standard October 1998attendantA PBX operator position. Attendants typically receive incoming calls andextend them

Pagina 527

List of terms 555Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideCustomer Controlled Routing (CCR)CCR is a product that enable

Pagina 528

556 List of terms553-3202-210 Standard October 1998Enhanced Serial Data Interface (ESDI)A Nortel Meridian 1 pack, numbered QPC513. This card su

Pagina 529

List of terms 557Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideOperations, Administration and Maintenance (OA&M)The tool

Pagina 530

558 List of terms553-3202-210 Standard October 1998SDI portThis is used for the optional sharing features that allow the IPE Module orthe Appli

Pagina 531

559Meridian Link Release 5C/CCR Release 3CInstallation and Upgrade GuideIndexAA/B switchboxconnecting 276sharing system consoles 276switching applicat

Pagina 532

560 Index553-3202-210 Standard October 1998receiving and unpacking 116SBC card (description) 58Application Module Link (AML)changing parameters

Pagina 533

Index 561Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideMVME712M card settings and cableconnections 141null modem RS-232 conne

Pagina 534

40 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Figure 6 illustrates the IPE Module occupying slots 5Ð7 of the Option

Pagina 535 - Chapter 17: Hardware upgrade

562 Index553-3202-210 Standard October 1998NT6D51AA description 76option settings 129power sense 82SDI/DCH switch settings 142, 143,146transiti

Pagina 536

Index 563Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideSDI port for conshare (X11 Release17) 315SDI port for conshare (X11 Re

Pagina 537 - Shutdown message screen

564 Index553-3202-210 Standard October 1998ACD telephones as AST 337CDNs 346IDC translation tables 326new mailbox 368non-ACD telephones as AST

Pagina 538

Index 565Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guideconfiguring (X11 Release 18) 305,308, 538, 540enabling (X11 Release 18

Pagina 539

566 Index553-3202-210 Standard October 1998host namedescription 7host port pinout 249host supportservice requirements 23service requirements (o

Pagina 540

Index 567Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guidedefinition 556faceplate 46field-replaceable items 547hardware 39indica

Pagina 541

568 Index553-3202-210 Standard October 1998link 0changing parameters 484default configuration 479description 15parameters 486link 1changing par

Pagina 542

Index 569Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guideshut down 412, 519status change 330system restart 413tape insertion 39

Pagina 543

570 Index553-3202-210 Standard October 1998Nno messagestatus change messages Group 0 332non-AST telephonesdefining as AST 341Nortel Publication

Pagina 544 - ACC card

Index 571Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideOperations, Administration, andMaintenance (OA&M)definition 557Opt

Pagina 545

Chapter 4: Meridian Link/CCR hardware 41Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 7Option 11 expansion cabinet11

Pagina 546

572 Index553-3202-210 Standard October 1998system console cable 248Play Voice session example 532portconfiguration settings 124configuring ESDI

Pagina 547 - Meridian Mail

Index 573Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideReflection 4+using on PC 266remote maintenance 32, 72Remote Supervisor

Pagina 548 - Creating a header file

574 Index553-3202-210 Standard October 1998options on cards 129port configuration 124SDI/DCH card jumper S2 143SDI/DCH card switch S2 142, 146U

Pagina 549

Index 575Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guideswitching applicationusing A/B switchbox 277system console 17, 32cable

Pagina 550

576 Index553-3202-210 Standard October 1998opening 291switch locations and settings 292verifyinglink status 483Versa Module Eurocard (VME) 558V

Pagina 551

Meridian Link/Customer Controlled RoutingInstallation and Upgrade GuideCopyright © 1998 Northern TelecomAll rights reservedInformation subject to chan

Pagina 552 - Before you begin

vi Contents553-3202-210 Standard October 1998Chapter 3: Overview of Customer ControlledRouting 27CCR application 30An example of CCR call handl

Pagina 553 - IPE Shelf

42 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Connector panel and I/O connectors (Option 11)Underneath each cabinet

Pagina 554

Chapter 4: Meridian Link/CCR hardware 43Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 9Option 11 connector panel (exp

Pagina 555 - Setting up STA

44 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998IPE Module Options 21Ð81In a Meridian 1 Options 21Ð81 system, the IPE

Pagina 556

Chapter 4: Meridian Link/CCR hardware 45Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideConnector panel and I/O connectors (Op

Pagina 557

46 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998IPE Module componentsThe IPE Module (Figure 12) contains an SMM167 si

Pagina 558

Chapter 4: Meridian Link/CCR hardware 47Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideThe LEDs show the following conditions

Pagina 559

48 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Figure 12IPE ModuleRESETABORTFAILSCSIRUNPWRSCSITP!!Tape driveCPU adap

Pagina 560

Chapter 4: Meridian Link/CCR hardware 49Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTape drive (IPE Module)The tape drive

Pagina 561

50 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Application ModuleAn Application Module (AM) is a Versa Module Euroca

Pagina 562

Chapter 4: Meridian Link/CCR hardware 51Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideTable 8Hardware upgrade paths for Meri

Pagina 563 - Chapter 20: Ordering

Contents viiMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 5: Hardware installation overview 87Preparing for installa

Pagina 564

52 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Table 9Hardware upgrade paths for CCR ModulesCCR ModuleconfigurationU

Pagina 565

Chapter 4: Meridian Link/CCR hardware 53Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideAEM powerThe AEM has an NT7D54AA (for

Pagina 566

54 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998!CAUTIONRisk of hardware damageIf you want to remove a card from an A

Pagina 567

Chapter 4: Meridian Link/CCR hardware 55Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideÑ NT7D62AC: a 240-Mbyte hard disk driv

Pagina 568 - Component failure rates

56 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Figure 14Application ModuleÑfront viewCCR/Co-resident Module (left si

Pagina 569

Chapter 4: Meridian Link/CCR hardware 57Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 15Application ModuleÑrear viewT

Pagina 570 - 552 Chapter 20: Ordering

58 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Single board computer card (Application Module)The first VME card slo

Pagina 571 - List of terms

Chapter 4: Meridian Link/CCR hardware 59Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideThere are four light-emitting diodes (

Pagina 572 - 554 List of terms

60 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998!CAUTIONRisk of data lossDo not press both the ABORT and the RESET sw

Pagina 573 - List of terms 555

Chapter 4: Meridian Link/CCR hardware 61Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 16MVME147SA-1 single board comp

Pagina 574 - 556 List of terms

viii Contents553-3202-210 Standard October 1998Chapter 7: Unpack and inspect hardware 115Receiving the IPE Module and Application Modulecompone

Pagina 575 - List of terms 557

62 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998MVME167-03This card, one of the Motorola MVME167 family, may be insta

Pagina 576 - 558 List of terms

Chapter 4: Meridian Link/CCR hardware 63Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideThere are eight light-emitting diodes

Pagina 577

64 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998¥ RESET switch This switch invokes a cold restart. The systemperform

Pagina 578 - 560 Index

Chapter 4: Meridian Link/CCR hardware 65Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 17MVME167-03 single board compu

Pagina 579 - Index 561

66 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998MVME333-2 X.25 communication controller (XCC) cardThe MVME333-2 X.25

Pagina 580 - 562 Index

Chapter 4: Meridian Link/CCR hardware 67Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 18MVME333-2 X.25 communication

Pagina 581 - Index 563

68 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998MVME332XT or MVME332XTS asynchronous communicationcontroller (ACC) ca

Pagina 582 - 564 Index

Chapter 4: Meridian Link/CCR hardware 69Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 19MVME332XTS asynchronous commu

Pagina 583 - Index 565

70 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Transition cardsThe MVME system serial I/O uses various transition ca

Pagina 584 - 566 Index

Chapter 4: Meridian Link/CCR hardware 71Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 20MVME712M transition card (App

Pagina 585 - Index 567

Contents ixMeridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideChapter 10: Installing peripheral devices 261VT220, VT320, and VT42

Pagina 586 - 568 Index

72 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998MVME712A and MVME712AM transition cardsThe MVME712A and MVME712AM car

Pagina 587 - Index 569

Chapter 4: Meridian Link/CCR hardware 73Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 21MVME712AM transition card (Ap

Pagina 588 - 570 Index

74 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998MVME705B transition cardThis transition card (shown in Figure 22) pro

Pagina 589 - Index 571

Chapter 4: Meridian Link/CCR hardware 75Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 22MVME705B transition card (App

Pagina 590 - 572 Index

76 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998NT6D51AA transition cardThis custom transition card (shown in Figure

Pagina 591 - Index 573

Chapter 4: Meridian Link/CCR hardware 77Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 23NT6D51AA transition card (App

Pagina 592 - 574 Index

78 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998P2 adapter boardThe P2 adapter board (shown in Figure 24) mounts dire

Pagina 593 - Index 575

Chapter 4: Meridian Link/CCR hardware 79Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuidePower supplyThe slide-in power supply

Pagina 594 - 576 Index

80 Chapter 4: Meridian Link/CCR hardware553-3202-210 Standard October 1998Disk/tape unitThe disk/tape unit (shown in Figure 26) is a slide-in a

Pagina 595 - Customer Controlled Routing

Chapter 4: Meridian Link/CCR hardware 81Meridian Link Release 5C/CCR Release 3C Installation and Upgrade GuideFigure 26Disk/tape unit (Application M

Comentarios a estos manuales

Sin comentarios